Pipeline Submerged Weight Modules

Links : ±
CALCULATOR MODULE : Beam Vibration Added Mass   ±

Calculate submerged beam added mass coefficient and added mass from gap height.

Added mass is included in the unit mass for submerged beams to account for the fluid which is displaced by the beam. The added mass coefficient can be calculated in accordance with DNVGL RP F105. The equation is suitable for undamped vibration of circular beams in a still fluid. For other beam profiles use the beam width. The method may not be valid for other profiles (engineering judgment is required). The gap height is measured along the axis of vibration and is assumed to be perpendicular to the adjacent surface.

Use the Result Table and Result Plot options to display tables and plots. Refer to the help pages for more details about the tools.

References :

Shock And Vibration Handbook, Cyril M Harris, McGraw Hill
Roark's Formulas For Stress And Strain, Warren C Young, McGraw Hill

Change Module :

CALCULATOR MODULE : Line Pipe Unit Mass And Weight   ±
CALCULATOR MODULE : ASME B31.4 Liquid Pipeline Mass And Weight   ±

Calculate ASME B31.4 liquid pipeline unit mass (mass per length), unit weight (weight per length), and total mass. The mass per joint can be calculated from the joint length. Construction quantities can be calculated from the total pipe length. Pipe unit mass and pipe unit weight (weight per length) can be calculated for multi layer pipelines (dry empty, dry full, wet empty and wet full pipelines). For multi layer pipelines, the first internal layer is the line pipe. Change the number of layers on the setup page. The line pipe diameter and thickness are calculated from the pipe schedule.

Use the Result Table option to display a table of pipe mass versus schedule wall thickness for the selected diameter.

Reference : ANSI/ASME B31.4 : Pipeline Transportation Systems For Liquids And Slurries (2012)

Change Module :

CALCULATOR MODULE : ASME B31.4 Liquid Pipeline Fluid Volume And Mass   ±

Calculate ASME B31.4 liquid pipeline fluid density, fluid volume and fluid mass for two phase gas liquid pipelines, and three phase black oil pipelines (gas water and oil).

The two phase fluid calculator can be used for single phase gas, single phase liquid, or two phase gas and liquid. The three phase black oil calculator can be used for single phase oil, single phase water, two phase oil and water, and three phase oil, water and gas. Water cut is the volume fraction of water in the liquid phase (ignoring the gas phase). Gas oil ratio (GOR) is the ratio of gas moles to liquid volume (ignoring the water phase). Gas moles are commonly measured as gas volume at standard conditions, eg SCM (Standard Conditions Meter) or SCF (Standard Conditions Feet).

Reference : ANSI/ASME B31.4 : Pipeline Transportation Systems For Liquids And Slurries (2012)

Change Module :

CALCULATOR MODULE : ASME B31.8 Gas Pipeline Mass And Weight   ±

Calculate ASME B31.8 gas pipeline unit mass (mass per length), unit weight (weight per length), and total mass for metal and plastic pipe.

The mass per joint can be calculated from the joint length. Construction quantities can be calculated from the total pipe length. Pipe mass and pipe unit weight (weight per length) can be calculated for multi layer pipelines (dry empty, dry full, wet empty and wet full pipelines). For multi layer pipelines, the first internal layer is the line pipe. Change the number of layers on the setup page. The line pipe diameter and thickness are calculated from the pipe schedule.

Plastic pipe wall thickness can be defined by wall thickness or diameter ratio (DR or IDR). Select standard diameter ratios from the plastic pipe schedule (SDR or SIDR), or use user defined diameter ratios (DR or IDR). Plastic pipe is generally only used in low pressure distribution systems.

Use the Result Table option to display a table of pipe mass versus schedule wall thickness for the selected diameter.

Reference : ANSI/ASME B31.8 : Gas Transmission And Distribution Piping Systems (2018)

Change Module :

CALCULATOR MODULE : ASME B31.8 Gas Pipeline Fluid Volume And Mass   ±

Calculate ASME B31.8 gas pipeline fluid density, fluid volume and fluid mass for two phase gas liquid piping, and three phase black oil piping (gas water and oil).

The two phase fluid calculator can be used for single phase gas, single phase liquid, or two phase gas and liquid. The three phase black oil calculator can be used for single phase oil, single phase water, two phase oil and water, and three phase oil, water and gas. Water cut is the volume fraction of water in the liquid phase (ignoring the gas phase). Gas oil ratio (GOR) is the ratio of gas moles to liquid volume (ignoring the water phase). Gas moles are commonly measured as gas volume at standard conditions, eg SCM (Standard Conditions Meter) or SCF (Standard Conditions Feet).

Reference : ANSI/ASME B31.8 : Gas Transmission And Distribution Piping Systems (2018)

Change Module :

CALCULATOR MODULE : DNVGL ST F101 Submarine Pipeline Flotation   ±

Calculate DNVGL-ST-F101 submarine pipeline flotation and vertical stability.

Select either the empty pipe or full pipe option. For vertical stability, the pipe specific gravity should be greater than or equal to 1.1.

The number of pipe internal and external layers, and the names of the layers can be changed on the setup page. The first internal layer is the line pipe. The line pipe wall thickness can either be selected from the pipe schedule, or the input value is used as the user defined value.

Reference : DNVGL-ST-F101 : Submarine Pipeline Systems (Download from the DNVGL website)

Change Module :

CALCULATOR MODULE : DNVGL ST F101 Submarine Pipeline Mass And Weight   ±

Calculate DNVGL-ST-F101 subsea pipeline unit mass (mass per length), and total mass from length.

The mass per joint can be calculated from the joint length. Construction quantities can be calculated from the total pipe length. Pipe unit mass (mass per length) and pipe unit weight (weight per length) can be calculated for multi layer pipelines (dry empty, dry full, wet empty and wet full pipelines). For multi layer pipelines, the first internal layer is the line pipe. Change the number of layers on the setup page.

Use the Result Table option to display a table of pipe mass and weight versus schedule wall thickness for the selected diameter.

Reference : DNVGL-ST-F101 : Submarine Pipeline Systems (Download from the DNVGL website)

Change Module :

CALCULATOR MODULE : DNVGL ST F101 Submarine Pipeline Fluid Mass And Volume   ±

Calculate DNVGL-ST-F101 subsea pipeline fluid volume and mass for two phase gas and liquid, and three phase oil, water and gas (black oil).

The two phase fluid calculator can be used for single phase gas, single phase liquid, or two phase gas and liquid. The three phase black oil calculator can be used for single phase oil, single phase water, two phase oil and water, and three phase oil, water and gas. Water cut is the volume fraction of water in the liquid phase (ignoring the gas phase). Gas oil ratio (GOR) is the ratio of gas moles to liquid volume (ignoring the water phase). Gas moles are commonly measured as gas volume at standard conditions, eg SCM (Standard Conditions Meter) or SCF (Standard Conditions Feet).

Reference : DNVGL-ST-F101 : Submarine Pipeline Systems (Download from the DNVGL website)

Change Module :

CALCULATOR MODULE : API RP 1111 Pipeline Mass And Weight   ±

Calculate API RP 1111 limit state pipeline unit mass (mass per length), unit weight (weight per length), and total mass.

The mass per joint can be calculated from the joint length. Construction quantities can be calculated from the total pipe length.

Pipe unit mass (mass per length) and pipe unit weight (weight per length) can be calculated for multi layer pipelines (dry empty, dry full, wet empty and wet full pipelines). The pipe diameter can be defined by either the outside diameter or the inside diameter. For multi layer pipelines, the first internal layer is the line pipe. The line pipe diameter and thickness are calculated from the pipe schedule. Change the number of layers on the setup page.

Use the Result Table option to display a table of pipe mass versus wall thickness for the selected diameter.

Reference : API RP 1111 : Design, Construction, Operation, and Maintenance of Offshore Hydrocarbon Pipelines (Limit State Design) (2011)

Change Module :

CALCULATOR MODULE : API RP 1111 Pipeline Fluid Volume And Mass   ±

Calculate API RP 1111 limit state pipeline fluid volume and fluid mass for two phase gas liquid piping, and three phase black oil piping (gas water and oil).

The two phase fluid calculator can be used for single phase gas, single phase liquid, or two phase gas and liquid. The three phase black oil calculator can be used for single phase oil, single phase water, two phase oil and water, and three phase oil, water and gas. Water cut is the volume fraction of water in the liquid phase (ignoring the gas phase). Gas oil ratio (GOR) is the ratio of gas moles to liquid volume (ignoring the water phase). Gas moles are commonly measured as gas volume at standard conditions, eg SCM (Standard Conditions Meter) or SCF (Standard Conditions Feet).

Reference : API RP 1111 : Design, Construction, Operation, and Maintenance of Offshore Hydrocarbon Pipelines (Limit State Design) (2011)

Change Module :

CALCULATOR MODULE : Subsea Pipeline Submerged Weight   ±

Calculate subsea pipeline submerged weight and specific gravity.

The specific gravity is the ratio of pipe mass over the mass of the displaced fluid. Objects heavier than water have a specific gravity greater than one.

Change Module :

DATA MODULE : Soil Properties : Density Uplift Coefficient Shear Strength And Friction Factor ( Open In Popup Workbook )   ±

Soil properties, soil density, uplift coefficient, shear strength and friction factors.

    Related Modules :