Pipeng Toolbox : DNVGL-ST-F101 Transition Length Calculators Login
Short Cuts
GO
Main ±
Beams ±
References ±
Fluid Flow ±
Fluid Properties ±
Maths ±
Materials ±
Pipelines ±
Soils ±
Subsea ±
Data ±
Units ±
Help ±
Demo

DNVGL ST F101 Submarine Pipeline Transition Length At Code Break

Calculate DNVGL-ST-F101 submarine pipeline transition length at code breaks.

The minimum transition length for pipeline components at a code break is four times the elastic length.

Reference : DNVGL-ST-F101 : Submarine Pipeline Systems (Download from the DNVGL website)

Change Module :

[FREE] tools are free in basic mode with no login (no plots, tables, goal seek etc). Login or Open a free account to use the tools in plus mode (with plots, tables, goal seek etc).
[PLUS] tools are free in basic CHECK mode with Login or Open a free account (CHECK values no plots, tables, goal seek etc). Buy a Subscription to use the tools in plus mode (with plots, tables, goal seek etc).
Try plus mode using the Plus Mode Demo tools with no login.   Help Using The Pipeng Toolbox (opens in the popup workbook)

Links : ±
CALCULATOR : DNVGL ST F101 Section 5.6.1 Subsea Pipeline Transition Length At Code Break [FREE]   ±

Calculate subsea pipeline transition length at code breaks (DNVGL-ST-F101 section 5.6.1 refer also to Figure 5-3). The transition length is 4 times the elastic length.

Tool Input

  • schdtype : Pipe Schedule Type
  • diamtype : Pipe Diameter Type
    • ODu : User Defined Outside Diameter
    • IDu : User Defined Inside Diameter
  • wtntype : Wall Thickness Type
    • tnu : User Defined Wall Thickness
  • ν : Poisson Ratio

Tool Output

  • Le : Elastic Length
  • Lt : Transition Length
  • OD : Pipe Nominal Outside Diameter
  • r : Pipe Mid Wall Radius
  • tn : Pipe Nominal Wall Thickness